Post go-live health check

Go-live reports celebrate training completion. Six months later the board is full of dummy jobs, the mobile forms are half-used, and the original champion has moved on. This health check is for that quieter period.

5–8 working days

Construction and field workers on a site with safety helmets

We interview the people who run the application now, not the people who implemented it. Planners, technicians, stores, and the remaining super-users walk us through a normal week, including the steps they take outside the system.

Configuration drift is documented: fields added without training, reports that no longer match the statuses in use, licence counts that do not match active crews, and integrations that were “temporary” at cutover.

You receive a health letter: what still matches the original design, what has been quietly abandoned, and a short list of repairs that can be done without opening a new implementation project.

What the engagement includes

  • Interviews with the team who run the system today
  • Configuration drift and licence check
  • Workaround inventory from yard and office
  • Health letter with a repair list, not a relaunch plan